/Vehicles/Allies/USA/02-MediumTanks/M26-Pershing/T23E3.htm | Up-dated: - |
76 mm gun and
torsion bar suspension. The design was classified "limited procurement" in May 1943 and 250 T23s were ordered; these were built between November 1943 and December 1944, although the design was never standardized or issued to front line units. |
File |